Warning: Use of undefined constant JPEG_QUALITY - assumed 'JPEG_QUALITY' (this will throw an Error in a future version of PHP) in /home/obsidian/public_html/wp-content/themes/obsidian/framework/inc/run.php on line 195
Sandbrook Gardens – Health & Safety Plan, Risk Assessment and Method Statement for approval and sign-off of the reconstruction of a boundary retaining wall immediately adjacent to operational Network Rail land | Obsidian
Looking for something similar? Call us on 0151 645 7571
to discuss your project

Sandbrook Gardens – Health & Safety Plan, Risk Assessment and Method Statement for approval and sign-off of the reconstruction of a boundary retaining wall immediately adjacent to operational Network Rail land

As part of the redevelopment of a former railway sidings and coal product storage yard/depot an existing 3.0 metre high retaining wall had to be part replaced and reconstructed. The boundary of the site was immediately adjacent to two operational railway lines; owned by Network rail. In order for the Works to proceed an Health & Safety Plan, Risk Assessment and Method Statement was drawn up by beech Consultants to satisfy the various requirements of Network Rail. The proposals were signed off by Network Rail.

Accreditations Beech Group Accreditations